On January 24, our Preparation Day
we took Sister Sheets and Elder Sheridan and
around the Zabkowice Slaskie Castle.
This CASTLE was begun in 1524 and has a square floor plan.
wing added to the Castle but was never completed.
Talk about a long building project!
Talk about a long building project!
to play house or stage a play or
puppet show!!
although there was signs of someone sleeping
just inside the front gate and there were foot prints
in the snow inside the walls of the castle.
Notice the round tower here.
just inside the front gate and there were foot prints
in the snow inside the walls of the castle.
the 1500's?
HUGE scaffolding!!
Even a different brick which was probably
added or reconstructed at a later time.
Why were these indentations here?
Sister Sheets wanted to but decided it was
too slick, I tried also but had a skirt on and
was frightened on the thoughts of coming down!
They are onthe south side and capable of
No comments:
Post a Comment